top of page

Abatement Oversight - North Olmsted, OH

Wells Environmental was contacted to do contractor oversight and air sampling at a large department store in the Cleveland area. A leaking pipe on the chiller unit required repair but the valves and pipe were insulated with asbestos. The asbestos needed to be removed before the repair could be made. Two workers attached glove bags to the pipe run and began abatement. Air sampling was conducted and the results analyzed immediately on site by us, giving the "all clear" within minutes of the remediation. If you're in need of immediate clearance results following your abatement, contact us today!

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2023 by Wells Environmental & Facilities Management

  • Black Facebook Icon
bottom of page